London Borough of Southwark
Details of Condition 3 (CEMP) as required by full planning permission 23/AP/3273 dated 19/11/2025 for 'Refurbishment of South Dock Marina boatyard to include demolition and removal of all buildings and structures on site, renew services infrastructure, new electricity substation, underground drainage, and hard standings and provide new workshops, studios, toilets showers laundry and associated landscape. Construct new covered boat repair areas with associated gantry and staircase. Removal of the existing crane and replace with new crane, pontoon adjacent to the crane and associated public realm works to the crane area. Addition of new trees to the river walk.'
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/AP/1893
- Local authority
- Southwark
- Ward
- SUDO
- Application type
- All Other
- Property type
- House
Key dates
- Submitted
- 3 Jul 2026
- Validated
- 3 Jul 2026
- Comments close
- 6 Sept 2026
- Target decision
- 27 Aug 2026
Estimated project value
£3k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyJobQuote 2026, £40-£120/m² installed.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPendingNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door