London Borough of Southwark
Refurbishment of South Dock Marina boatyard to include demolition and removal of all buildings and structures on site, renew services infrastructure, new electricity substation, underground drainage, and hard standings and provide new workshops, studios, toilets showers laundry and associated landscape. Construct new covered boat repair areas with associated gantry and staircase. Removal of the existing crane and replace with new crane, pontoon adjacent to the crane and associated public realm works to the crane area. Addition of new trees to the river walk.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 23/AP/3273
- Local authority
- Southwark
- Ward
- SUDO
- Application type
- All Other
- Property type
- House
Key dates
- Submitted
- 27 Nov 2023
- Validated
- 27 Nov 2023
- Comments close
- 27 Mar 2025
- Target decision
- 26 Feb 2024
- Decided
- 20 Nov 2025
Estimated project value
£3k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyJobQuote 2026, £40-£120/m² installed.
Floor area gained: 2,065.2m²
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPendingNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door