London Borough of Southwark
Removal of all existing front elevation single-glazed timber sash windows to be replaced with new double-glazed timber sash windows on a like-for-like basis. Removal of the casement timber windows at the rear and flank elevations and replacement with new double-glazed uPVC casement windows. In addition replacement of the UPVC door set with double-glazed uPVC door set.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 22/AP/0255
- Local authority
- Southwark
- Ward
- GOGR
- Application type
- All Other
Key dates
- Submitted
- 25 Apr 2022
- Validated
- 25 Apr 2022
- Target decision
- 19 Jun 2022
- Decided
- 15 Jun 2022
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- 8 Oakhurst Grove London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- 22 Oakhurst Grove London Borough of SouthwarkPermittedAdjoining
- London Borough of Southwark SE22 9AQPermittedAdjoining