London Borough of Hammersmith and Fulham
Non-Material Minor Amendment to Planning Permission 2016/00765/VAR dated 29th July 2016, amendments sought to change the wording on conditions 16 (Materials), 23 (Lifetime Homes), 24 (Children's Play Space Strategy), 27 (Micro Climate Mitigation), 30 (Green/Brown Roofs), 31 (Energy Strategy), 36 (Sound Insulation), 37 (Lighting Management Plan), 42 Accessibility Strategy), 49 (Landscape and Ecology Management Plan), 63 (Privacy Strategy) and 64 Typical Bays the wording of these condition to read 'prior to the commencement of above ground works but excluding demolition and basement works'.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2019/01215/NMAT
- Local authority
- Hammersmith and Fulham
- Ward
- SANDSE
- Application type
- All Other
Key dates
- Submitted
- 17 Apr 2019
- Validated
- 17 Apr 2019
- Target decision
- 15 May 2019
- Decided
- 14 May 2019
Estimated project value
£100k–£250k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamWithdrawnNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door