London Borough of Hammersmith and Fulham
Submission of details of a method statement for the salvage, secure storage, repair and reinstatement of internal architectural features including glazing to external windows, pursuant to Condition 11; and details and samples of external materials of to be used in the refuse store, pursuant to the partial discharge of Condition 12 of listed building consent reference: 2019/00061/VLBC dated 7th June 2019.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2019/01012/DLBC
- Local authority
- Hammersmith and Fulham
- Ward
- HBROAD
- Application type
- All Other
Key dates
- Submitted
- 3 Apr 2019
- Validated
- 3 Apr 2019
- Comments close
- 25 Apr 2019
- Target decision
- 29 May 2019
- Decided
- 23 Oct 2020
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamRefusedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamUnknownNext door
- London Borough of Hammersmith and FulhamPermittedNext door