Greenwich
Installation of new external basement doors, alterations and refurbishment to internal floors, new basement internal openings in load bearing walls and partitions, removal of bathroom fittings at ground level, removal of fire resistant glazed screen to first and second floor landing, remove existing first and second floor kitchens, reconfigure and replace bathroom fittings on the first and second floors, and associated internal and external alterations. (This application Impacts a Grade 2 Listed Building)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/2882/L
- Local authority
- Greenwich
- Ward
- GREENWICH PARK
- Application type
- All Other
Key dates
- Submitted
- 9 Sept 2024
- Validated
- 9 Sept 2024
- Comments close
- 30 Oct 2024
- Decided
- 4 Nov 2024
Estimated project value
£100k–£250k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.