Greenwich
At Basement: form new openings in two loadbearing walls; form new window opening to Store 2; replace doors to Wine Cellar and Store 2; form new Store 1, Larder and Laundry Room; create Lower and Upper Patio areas including retaining wall, steps and planting boxes; enlarge existing window openings to form door access to new patio (two pairs of glazed doors). At Ground Floor, remove existing bathroom fittings. At First Floor: remove fire resistant glazed screen to Landing and remove existing Kitchen; and reconfigure and replace bathroom fittings. At Second Floor: remove fire resistant glazed screen to Landing and remove existing Kitchen; and reconfigure and replace bathroom fittings. At Roof: undertake roof repairs in natural slates; and install 10no. solar panels. Throughout: replace all windows with double-glazed sliding-sash wooden windows to match existing; and all other associated works.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 23/1831/L
- Local authority
- Greenwich
- Ward
- GREENWICH PARK
- Application type
- All Other
Key dates
- Submitted
- 5 Jun 2023
- Validated
- 5 Jun 2023
- Comments close
- 9 Aug 2023
- Decided
- 7 Dec 2023
Estimated project value
£100k–£250k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.