Spark York Piccadilly York
Replacement of two existing scaffold staircases with new steel stair structures incorporating intermediate landings and integrated lighting; relocation of existing passenger lift to the rear of the site; rationalisation and improvement of the entrance forecourt including resurfacing, removal of level changes, and replacement of existing double-leaf entrance gate with a single-leaf timber-clad door; extension of existing first-floor decking in two locations to provide additional unexposed external seating, introduction of one lightwell through existing first-floor deck; removal of fixed furniture from existing entrance hall to enable flexible community use; extension of timber cladding to southern site boundary with new access door with associated cosmetic repairs, re-finishing and upgrading of existing guarding and railing systems
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/01909/FUL
- Local authority
- York
Key dates
- Submitted
- 26 Oct 2026
- Validated
- 26 Oct 2026
- Comments close
- 19 Nov 2026
- Target decision
- 21 Dec 2026
Estimated project value
£6k–£20k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.