Site Of St Edwards Roman Catholic Church Scot Lane Wigan
Condition Discharge application to discharge Condition No.4 (Coal Mining), Condition No.6 (Contamination), Condition No.7 (CEMP), Condition No.8 (Affordable Housing), Condition No.11 (HMMP), Condition No.12 (Bird and Bat Boxes), Condition No.15 (Materials), Condition No.16 (Refuse Storage), Condition No.21 (Finished Floor Levels) and Condition No.24 (Site Access) in respect of previously approved application A/25/100145/MAJOR
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- A/26/101783/CON
- Local authority
- Wigan
- Ward
- Douglas
- Application type
- Conditions
- Property type
- House
Key dates
- Submitted
- 9 Nov 2026
- Validated
- 9 Nov 2026
- Target decision
- 4 Jan 2027
28 documents · 0 comments · 0 constraints
Estimated project value
£3k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyJobQuote 2026, £40-£120/m² installed.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.