← Back to search

Withdrawn23/01130/LBCSubmitted 3 years agoBasement

Westminster

Installation of air conditioning units to rear and side elevations, rear railings and walkways for fire safety, alterations to tiling at the rear, replacement of uPVC windows with timber windows, lighting fixtures, lift from basement to fourth floor level, internal partitions, cornicing details and pipework (part etrospective). (Linked with 23/01129/FULL).

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
2 Mar 2023
— completed
Validated
2 Mar 2023
— completed
Consultation
—
— completed
Target date
27 Apr 2023
— completed
Decided
27 Apr 2023
— completed

Application details

Reference
23/01130/LBC
Local authority
Westminster
Ward
LGW_22
Application type
All Other

Key dates

Submitted
2 Mar 2023
Validated
2 Mar 2023
Target decision
27 Apr 2023
Decided
27 Apr 2023

Estimated project value

£100k–£250k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications