← Back to search

Permitted21/04490/LBCSubmitted 5 years agoWindows and doors

Westminster

Refurbishment works to front lightwell, external railings and steps. Alterations to pavement vaults to include new vault doors. Use of pavement vault to accommodate plant. Replacement of main entrance door at ground floor, and alterations to lower ground and ground floor windows in rear courtyard. Reconfiguration of fourth bedroom to retain existing hallway access to lower ground floor entrance door and Internal reconfiguration including ceiling and lighting alterations.

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
26 Jul 2021
— completed
Validated
26 Jul 2021
— completed
Consultation
—
— completed
Target date
20 Sept 2021
— completed
Decided
16 Nov 2021
— completed

Application details

Reference
21/04490/LBC
Local authority
Westminster
Ward
KBB_02
Application type
All Other

Key dates

Submitted
26 Jul 2021
Validated
26 Jul 2021
Target decision
20 Sept 2021
Decided
16 Nov 2021

Estimated project value

£4k–£12k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications