Westminster
Variation of condition 1 and removal of condition 2 of listed building consent dated 27 February 2019 (RN: 19/00024/LBC) for the: Alterations to ground and lower ground front window openings. Namely, to omit the requirement to replace the front ground and lower ground windows with single glazing to keep the current double glazing installation and to omit the associated drawings.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 21/02190/LBC
- Local authority
- Westminster
- Ward
- LVB_02
- Application type
- All Other
Key dates
- Submitted
- 30 Mar 2021
- Validated
- 30 Mar 2021
- Target decision
- 25 May 2021
- Decided
- 20 May 2021
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- 184, 186 Sutherland Avenue Westminster W9 1HRRefusedNext door
- 184, 186 Sutherland Avenue Westminster W9 1HRRefusedNext door
- 184, 186 Sutherland Avenue Westminster W9 1HRPermittedNext door
- 184, 186 Sutherland Avenue Westminster W9 1HRPermittedNext door
- WestminsterPermittedNext door
- 184, 186 Sutherland Avenue Westminster W9 1HRPermittedNext door