Westminster
Internal works at second floor level including ducting, vents through the window glass, a raised floor, lead protection on some of the walls and partitions.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 20/08254/LBC
- Local authority
- Westminster
- Ward
- MHC_02
- Application type
- All Other
Key dates
- Submitted
- 12 Jan 2021
- Validated
- 12 Jan 2021
- Target decision
- 9 Mar 2021
- Decided
- 5 Mar 2021
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- 86 Harley Street Westminster W1G 7HPPermittedNext door
- WestminsterPermittedNext door
- WestminsterPermittedNext door
- 82 Harley Street Westminster W1G 7HNPermittedNext door
- 82 Harley Street Westminster W1G 7HNPermittedNext door
- 82 Harley Street Westminster W1G 7HNPermittedNext door