Westminster
Variation of condition 1 of planning permission dated 21 August 2019 (RN: 19/04624/FULL) for the replacement of existing mains water system to include water storage tanks at basement level. NAMELY to allow a revised access of the water main and pipe routes.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 19/08848/FULL
- Local authority
- Westminster
- Ward
- KBB_02
- Application type
- All Other
Key dates
- Submitted
- 14 Nov 2019
- Validated
- 14 Nov 2019
- Comments close
- 25 Dec 2019
- Target decision
- 9 Jan 2020
- Decided
- 9 Jan 2020
Estimated project value
£100k–£250k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- WestminsterPermittedNext door
- Kensington Gore Westminster SW7 2APPermittedNext door
- Kensington Gore Westminster SW7 2APPermittedNext door
- WestminsterPermittedNext door
- WestminsterPermittedNext door
- Kensington Gore Westminster SW7 2APPermittedNext door