← Back to search

UnknownWD/2026/1344/LBSubmitted 2 weeks agoHeat pump

LITTLEGATES, CHURCH ROAD, HELLINGLY, BN27 4EX

PROPOSED INSTALLATION OF EXTERNAL E-TEC HYBRID AIR SOURCE HEAT PUMP UNIT AND INTERNAL HYBRID BOILER EQUIPMENT REPLACING EXISTING HEATING EQUIPMENT WITH ASSOCIATED FLOW AND RETURN PIPEWORK LINKING EXTERNAL AND INTERNAL ELEMENTS.

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
13 Oct 2026
— completed
Validated
—
— not yet reached
Consultation
—
— not yet reached
Target date
—
— not yet reached
Decided
—
— not yet reached

Application details

Reference
WD/2026/1344/LB
Local authority
Wealden

Key dates

Submitted
13 Oct 2026

Estimated project value

£8k–£15k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade / GreenMatch 2026, excluding Boiler Upgrade Scheme grant.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.