Richmonds Farm Radwinter End Radwinter Essex CB10 2UD
Non Material Amendment to UTT/26/1026/HHF - Minor amendments to the external finishes, comprising the replacement of timber windows and doors with aluminium-framed units incorporating glazing bars, and a change from horizontal to vertical timber cladding.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- UTT/26/2830/NMA
- Local authority
- Uttlesford
- Property type
- Agricultural
Key dates
- Submitted
- 10 Nov 2026
- Validated
- 10 Nov 2026
- Target decision
- 8 Dec 2026
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.