Tower Hamlets
Application for non-material amendment of planning permission dated 11/08/25 , ref: PA/24/00996The Non Material Amendment(s) Sought are to the consented landscape strategy and play space provision within Phase 2 of the Bow Common development.The following provides a summary of these amendments: New under 5's playspace provision introduced in the Ginnel Area; Additional 5-11s play provision within the Ginnel which will provide a greater variety in play setting across the development; Partial relocation of playspace from the Phase 3 podium ; Adjustments to pathways and landscape to reduce potential conflicts between movement and play; An enhanced relationship between play and the Pavilion caf‚ enabling parental supervision and natural surveillance within the Ginnel; and Integrated landscape and play design, combining planting, natural features and play elements.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- PA/26/01783/S
- Local authority
- Tower Hamlets
- Ward
- Bromley South
- Application type
- All Other
Key dates
- Submitted
- 16 Oct 2026
- Validated
- 16 Oct 2026
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.