Tower Hamlets
Proposed Works: Replacement of the principal entrance doorset. The existing fully glazed double doors will be replaced with a new stainless steel-framed 1.5-leaf doorset to improve building security, as the current doorset cannot be securely locked. The entrance fob sensor, exit button, and intercom will be relocated and integrated into the new entrance doorset to prevent unauthorised access to the vestibule.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- PA/26/01271/NC
- Local authority
- Tower Hamlets
- Ward
- St Katharines and Wapping
- Application type
- All Other
Key dates
- Submitted
- 29 Jul 2026
- Validated
- 29 Jul 2026
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.