← Back to search

PermittedPA/23/02203/NCSubmitted 2 years agoWindows and doors

Tower Hamlets

Application for certificate of lawfulness in respect of proposed works will comprise the removal of the existing combustible materials within the wall build up, through an extensive fa‡ade replacement, with a Euro fire class A2-S1,d0 alternative fa‡ade system to match existing materiality, scale, colour, architectural appearance and thermal & acoustic performance to ensure compliance with current fire safety legislation Works will relate to the replacement of the fa‡ade on a like for like basis. All other aspects of the existing building such as access, refuse collection, landscape and existing window openings and configuration will remain as existing.

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
6 Dec 2023
— completed
Validated
6 Dec 2023
— completed
Consultation
—
— completed
Target date
—
— completed
Decided
2 Jan 2024
— completed

Application details

Reference
PA/23/02203/NC
Local authority
Tower Hamlets
Ward
Bethnal Green West
Application type
All Other

Key dates

Submitted
6 Dec 2023
Validated
6 Dec 2023
Decided
2 Jan 2024

Estimated project value

£4k–£12k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications