Tower Hamlets
Proposed restoration of front elevation to include: Removal of existing paint to expose the brick work underneath, remove defective cement based pointing, flush repointing of brick fa‡ade using ratio of 2 washed sand to 1 natural lime mortar. Brick buffing and cleaning. New rendered plinth detail to bottom of fa‡ade Removal of existing rendered cornice to parapet, new cornice installed to traditional design Restoration of window and door surrounds to match original design as closely as possible.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- PA/23/00922/NC
- Local authority
- Tower Hamlets
- Ward
- Bow West
- Application type
- Householder
Key dates
- Submitted
- 17 May 2023
- Validated
- 17 May 2023
- Decided
- 13 Jul 2023
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Tower HamletsPermittedNext door
- Tower Hamlets E3 5EGPermittedNext door
- Tower HamletsPermittedNext door
- Tower Hamlets E3 5EGPermittedNext door
- Tower Hamlets E3 5EGPermittedNext door
- Tower Hamlets E3 5EGPermittedNext door