Tower Hamlets
Application for non-material amendment to reserved matters consent ref: PA/13/02966, dated 24/12/2014. Non-Material Amendments Sought:Extent of the basement is reduced in size.Removal of Level B3 for Phase 2 and majority of Phase 3.Reduction in the extent of the concrete road box.Relocation of the loading bay from the east of phase 2 to the centre of phase 2.Reconfiguration of the infrastructure plant and energy centre.Layout changes to C2 and D3/D4.Re-location of the lorry lift.Removal of Phase 2 access ramp to Level B1.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- PA/19/02307/NC
- Local authority
- Tower Hamlets
- Ward
- Canary Wharf
- Application type
- All Other
Key dates
- Submitted
- 21 Oct 2019
- Validated
- 21 Oct 2019
- Decided
- 19 Dec 2019
Estimated project value
£100k–£250k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Tower Hamlets E14 9SFUnknownNext door
- Tower HamletsPermittedNext door
- Tower Hamlets E14 9SFPermittedNext door
- Tower HamletsRefusedNext door
- Tower HamletsPermittedNext door
- Tower HamletsPermittedNext door