Telecommunications Sub Station Alt Hill Lane Ashton-under-lyne Tameside OL6 8AG
Creation of a new vehicular access from Alt Hill Lane and erection of a telecommunications cable landing station comprising a cabin (approximately 10.5m x 3.3m and 3.35m in height), generator, meter cabinet, fibre chamber and a 20m x 12m compound enclosed by 1.8m high mesh fencing, together with associated engineering works, concrete bases, earthworks and ancillary infrastructure.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/00795/FUL
- Local authority
- Tameside
- Property type
- House
Key dates
- Submitted
- 14 Oct 2026
- Validated
- 14 Oct 2026
- Comments close
- 12 Nov 2026
- Target decision
- 9 Dec 2026
Estimated project value
£3k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyJobQuote 2026, £40-£120/m² installed.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.