1 Cherry Tree Walk Mossley Tameside OL5 0EH
Full discharge of Condition 3 (Contaminated Land), Condition 4 (Materials), Condition 6 (CEMP), Condition 8 (Hard and Soft Landscaping) and Condition 10 (Surface Water Drainage Scheme) of planning reference 18/00731/FUL
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/00104/PLCOND
- Local authority
- Tameside
- Property type
- House
Key dates
- Submitted
- 1 Oct 2026
- Validated
- 6 Oct 2026
- Target decision
- 29 Dec 2026
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.