London Borough of Southwark
Demolition of the existing shopfront at 222 Tower Bridge Road, including removal of the existing double doors, adjacent glazing, and a faux column, whilst retaining the central structural column. Rebuilding of the shopfront within the original width with a new timber-framed, inward-opening bi-fold/folding door system, with traditional mullion, rail proportions and glazing to match the established shopfront rhythm along Tower Bridge Road. (Amended)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/AP/1484
- Local authority
- Southwark
- Ward
- NBER
- Application type
- All Other
- Property type
- Commercial
Key dates
- Submitted
- 9 Jun 2026
- Validated
- 9 Jun 2026
- Comments close
- 14 Aug 2026
- Target decision
- 3 Aug 2026
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- 222 Tower Bridge Road London Borough of Southwark SE1 2UPPermittedNext door
- 224A Tower Bridge Road London Borough of Southwark SE1 2UPPendingNext door
- Tower Bridge Road Southwark SE1 2UPPermittedNext door
- 218 Tower Bridge Road London Borough of Southwark SE1 2UPPendingNext door