London Borough of Southwark
Installation of air source heat pumps (ASHPs), a new electric substation and relocation of bin storage areas and cycle parking to accommodate an ASHP enclosure. Remedial / replacement works to existing windows and doors, installation of thermal insulation in the roof zone above the pool halls. Photovoltaic panels proposed over pool and gym hall pitched roofs.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/AP/0388
- Local authority
- Southwark
- Ward
- SGIL
- Application type
- All Other
Key dates
- Submitted
- 10 Feb 2026
- Validated
- 10 Feb 2026
- Comments close
- 9 Apr 2026
- Target decision
- 6 Apr 2026
- Decided
- 24 Jun 2026
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPendingNext door
- London Borough of SouthwarkPermittedAdjoining
- London Borough of Southwark SE5 8TSPermitted57 yd
- London Borough of SouthwarkPermitted67 yd
- 19 CAMBERWELL CHURCH STREET Southwark SE5 8TRPermitted72 yd