Tower Bridge Road London Borough of Southwark
Maintenance works to the three 'mud tanks' of Tower Bridge, to repair and re-line the tanks, as well as to improve the safety of access to them, via the extension of the existing access platform, new safety railings, and repair of rotting timber floor below.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 25/AP/1881
- Local authority
- Southwark
- Ward
- LBWB
- Application type
- All Other
Key dates
- Submitted
- 23 Jul 2025
- Validated
- 23 Jul 2025
- Comments close
- 18 Aug 2025
- Target decision
- 16 Sept 2025
- Decided
- 22 Aug 2025
Estimated project value
£2k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- Tower Bridge Road London Borough of Southwark SE1 2UPPermittedNext door
- London Borough of SouthwarkPermittedNext door
- Tower Bridge Road London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedAdjoining