London Borough of Southwark
Details of Condition 5- External Materials Schedule as required by 23/AP/3279 dated 13/11/2024 for Proposed demolition and replacement of existing pier (including new pontoon, canting brow and piles), alongside refurbishment of existing landside peninsula and installation of proposed lightweight over dock walkway, to facilitate a new fully accessible electric cross-river ferry service from Rotherhithe Pier to Canary Wharf Pier.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 25/AP/1385
- Local authority
- Southwark
- Ward
- SUDO
- Application type
- All Other
Key dates
- Submitted
- 9 May 2025
- Validated
- 9 May 2025
- Comments close
- 12 Jun 2025
- Target decision
- 3 Jul 2025
- Decided
- 23 Jun 2025
Estimated project value
£5k–£40k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPending60 yd