St Thomas Street London Borough of Southwark
Method Statement(s), Schedule of Works and Specification for the repairs to the statue and plinth as required by Condition 5 and samples of the plinth repairs as required by Condition 4 of Listed Building Consent 22/AP/4285 dated 01/03/2023 for Installation of temporary and permanent interpretation boards associated with the statue of Thomas Guy as well as conservation works to the statue, pedestal and railings.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 25/AP/1045
- Local authority
- Southwark
- Ward
- LBWB
- Application type
- All Other
Key dates
- Submitted
- 8 Apr 2025
- Validated
- 8 Apr 2025
- Comments close
- 30 Apr 2025
- Target decision
- 2 Jun 2025
- Decided
- 24 Apr 2025
Estimated project value
£2k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- St Thomas Street London Borough of SouthwarkPermittedNext door
- London Borough of Southwark SE1PermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkWithdrawnNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door