London Borough of Southwark
Non-material amendment to planning permission 20/AP/0681 (Construction of tunnelled connections to the existing Northern Line platforms from a new station box for the Elephant and Castle London Underground Northern Line Station) to enable works at platform level for the breakthrough of the new passenger link tunnels; and amendments to the wording of conditions 3 (geotechnical design report) and 5 (Construction method statement).
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 25/AP/0603
- Local authority
- Southwark
- Ward
- NWAL
- Application type
- All Other
Key dates
- Submitted
- 11 Mar 2025
- Validated
- 11 Mar 2025
- Target decision
- 7 Apr 2025
- Decided
- 15 May 2025
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Elephant And Castle London Borough of Southwark SE1 6LWPermittedNext door
- London Borough of SouthwarkPermittedNext door
- Elephant And Castle London Borough of Southwark SE1 6LWPermittedNext door
- London Borough of SouthwarkPermittedNext door
- Elephant And Castle London Borough of Southwark SE1 6LWPermittedNext door
- London Borough of SouthwarkRefusedAdjoining