London Borough of Southwark
Installation of a modular unit with an air source heat pump, air conditioning condenser unit and electric vehicle charging point to support the teaching of renewable energy technology within Rotary Yard and associated works, including the installation of fencing and a gate to enclose the modular unit and new paving.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/AP/2766
- Local authority
- Southwark
- Ward
- SGEO
- Application type
- All Other
Key dates
- Submitted
- 9 Oct 2024
- Validated
- 9 Oct 2024
- Comments close
- 31 Oct 2024
- Target decision
- 3 Dec 2024
- Decided
- 23 Jan 2025
Estimated project value
£8k–£15k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade / GreenMatch 2026, excluding Boiler Upgrade Scheme grant.
Floor area gained: 6m²
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Southwark SE1 6FEPendingNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- 123-131 including Duke of Clarence PH London Road 113-119 BOROUGH ROAD Southwark SE1PermittedAdjoining
- London Borough of SouthwarkPermittedAdjoining
- London Borough of SouthwarkPermittedAdjoining