London Borough of Southwark
Retention of x4 Air Source Heat Pumps (ASHPs) at ground floor level. The installation of insulation and 4 ASHP systems, each consisting of one external and one internal unit per dwelling. No alterations to the building structure or grounds will take place beyond the installation of the external ASHP units.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/AP/2230
- Local authority
- Southwark
- Ward
- OLKE
- Application type
- All Other
- Property type
- House
Key dates
- Submitted
- 18 Dec 2024
- Validated
- 18 Dec 2024
- Comments close
- 30 Jan 2025
- Target decision
- 11 Feb 2025
- Decided
- 22 Apr 2025
Estimated project value
£8k–£15k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade / GreenMatch 2026, excluding Boiler Upgrade Scheme grant.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkRefusedNext door
- 25, 27 Trafalgar Avenue London Borough of Southwark SE15 6NPPermittedNext door
- London Borough of SouthwarkWithdrawnNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door