London Borough of Southwark
Partial discharge of Part (b) of the Condition 11 (Secured by design inspection) required by planning permission ref: 20/AP/1302 granted on 03/02/2021 for: (Demolition of existing buildings and construction of new centre for Children and Young People to include outpatients, inpatients, school, research and clinical floorspace, associated roof terraces, cycle parking, services compound and landscaping).
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/AP/1662
- Local authority
- Southwark
- Ward
- SGIL
- Application type
- All Other
Key dates
- Submitted
- 6 Jun 2024
- Validated
- 6 Jun 2024
- Comments close
- 3 Jul 2024
- Target decision
- 31 Jul 2024
- Decided
- 29 Jul 2024
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of Southwark SE5 8AZPermittedNext door
- London Borough of Southwark SE5 8AZPermittedNext door
- London Borough of Southwark SE5 8AZPermittedNext door
- London Borough of SouthwarkPermittedNext door