← Back to search

Permitted23/AP/1878Submitted 3 years agoWindows and doors

London Borough of Southwark

- Replace the existing blank / opaque fixed windows with transparent casement window and fixed window in studios at 1st -17th floors; - Replace the glazing of the existing blank / opaque window with transparent glazing in the laundry room at 1st floor; - Replace existing transparent glazing with opaque glazing to accommodate an accessible bathroom pod in existing studios at 2nd -17th floors (1 studio per floor); - Replace the existing 1.5 metre high glazed screen with a new 2.5 metre glazed screen around the external amenity terrace at 18th floor; and - New glazed curtain walling and entrance door below zone of existing canopy.

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
12 Jul 2023
— completed
Validated
12 Jul 2023
— completed
Consultation
21 Sept 2023
— completed
Target date
5 Sept 2023
— completed
Decided
22 Sept 2023
— completed

Application details

Reference
23/AP/1878
Local authority
Southwark
Ward
NWAL
Application type
All Other
Property type
House

Key dates

Submitted
12 Jul 2023
Validated
12 Jul 2023
Comments close
21 Sept 2023
Target decision
5 Sept 2023
Decided
22 Sept 2023

Estimated project value

£4k–£12k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications