London Borough of Southwark
Discharge of Schedule 3, paragraph 15.2 (Travel plan) for phase MP4 (Plots H11a and H11b) of the section 106 agreement associated with outline permission ref. 12/AP/1092 granted 27/03/2013 (for: Outline application for: Redevelopment to provide a mixed use development comprising a number of buildings ranging between 13.13m (AOD) and 104.8m (AOD) in height with capacity for between 160,579sqm GEA (min) and 254,000sqm GEA (max) residential floorspace together with retail (Class A1-A5), business (Class B1), leisure and community (Class D2 and D1), energy centre (sui generis) uses. New landscaping, park and public realm, car parking, means of access and other associated works).
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 22/AP/3166
- Local authority
- Southwark
- Ward
- NWAL
- Application type
- All Other
- Property type
- Commercial
Key dates
- Submitted
- 31 Aug 2022
- Validated
- 31 Aug 2022
- Comments close
- 29 Sept 2022
- Target decision
- 25 Oct 2022
- Decided
- 27 Sept 2022
Estimated project value
£15k–£120k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkPermittedNext door