← Back to search

Permitted22/AP/0405Submitted 4 years agoRender and cladding

London Borough of Southwark

The works comprise two main parts:- a) Temporary removal of footway and carriageway paving; shallow excavation (on average 100mm and NOT exposing existing structure nor existing waterproofing); application of a spray-applied waterproofing membrane to sub-base of carriageway and footways; full reinstatement of all footway and carriageway paving/finishes as existing, b) Partial removal of 1960's/70's render to east elevation of viaduct, affronting no.1 Southwark Bridge Road, followed by cleaning of exposed original brickwork. To include brick repairs and re-pointing of brick joints, as and where necessary.

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
11 Feb 2022
— completed
Validated
11 Feb 2022
— completed
Consultation
1 Apr 2022
— completed
Target date
7 Apr 2022
— completed
Decided
6 Apr 2022
— completed

Application details

Reference
22/AP/0405
Local authority
Southwark
Ward
BOBA
Application type
All Other

Key dates

Submitted
11 Feb 2022
Validated
11 Feb 2022
Comments close
1 Apr 2022
Target decision
7 Apr 2022
Decided
6 Apr 2022

Estimated project value

£6k–£20k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications