← Back to search

Permitted21/AP/0903Submitted 5 years agoRoof works

London Borough of Southwark

External and internal refurbishment of the lower and upper floor flats. External works include fabric repairs, removal of blacktop to front entrance steps and repairs/ replacement of stone treads, replacement of Upvc windows and doors (lower flat), redecoration of existing timber windows in a darker colour (upper flat), replacement of modern front entrance door, widening of the opening on the rear facade and new doors with side lights (lower flat), reconfiguration of the roof to the outrigger and installation of a zinc roof with rooflight (upper flat), removal of existing rooflight and installation of a new conservation style rooflight (upper flat). Reinstatement of the front boundary treatment, by the introduction of brick piers and plinth cast iron railings and gate (Revised description).

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
16 Mar 2021
— completed
Validated
16 Mar 2021
— completed
Consultation
—
— completed
Target date
10 May 2021
— completed
Decided
29 Oct 2021
— completed

Application details

Reference
21/AP/0903
Local authority
Southwark
Ward
OLKE
Application type
All Other
Property type
Flat

Key dates

Submitted
16 Mar 2021
Validated
16 Mar 2021
Target decision
10 May 2021
Decided
29 Oct 2021

Estimated project value

£7k–£19k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade / BestBuilders 2026 roof replacement, 3-bed semi.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications