← Back to search

Permitted20/AP/3199Submitted 5 years agoBasement

London Borough of Southwark

Details for Condition 6- Detailed (Phase 1) - Demolition Management plan and the partial discharge of Condition 8 (to cover the Phase 2 works) as required by planning permission 17/AP/2773 dated 30/10/2020 for Hybrid application comprising a full planning application for Phase 1 (the 'Detailed Component') and outline planning permission (the 'Outline Component') for Phases 2 & 3: Detailed Component (Phase 1): Full planning permission for the demolition of existing buildings and structures and redevelopment of the central area for the erection of a total of 4 buildings, two at 7 storeys (Buildings B9&B12), one at 15 storeys (Building B10), and one at 44 storeys (Building B4) (max height 147.12m AOD) to provide 420 homes, 1,197 sqm GEA of Class B1(c) floorspace and 785 sqm GEA of non-residential floor space within classes A1-A4 (retail), Class B1 (business) and Class D1 (public services) and D2 (entertainment and leisure) use, an energy centre (750 sqm) and new public open space and public realm with on street and basement car parking spaces and cycle spaces. Outline Component (Phase 2 & 3): Outline planning permission (scale, layout, landscaping, access and appearance reserved) for the demolition of existing buildings and structures and the erection of a seven buildings (B1, B2, B3, B5, B6, B7, B11) ranging in height from 5 to 35 storeys (max height 132.9m AOD) to provide up to 88,052sqm floorspace GEA, comprising up to 880 residential units, up to 3, The submission is formed of a Demolition Management Plan. Please refer to the submitted Covering Letter for the full condition wording. Condition 8 reiterates the wording of Condition 6 but is tailored for Phase 2 and 3 of the permission. The applicant is seeking to partially discharge Condition 8 to allow Phase 2 demolition to be undertaken at the same time as Phase 1, with the submission of details related to Phase 3 to be submitted at a later date prior to demolition of the Phase 3 parcel of the Site.

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
3 Nov 2020
— completed
Validated
3 Nov 2020
— completed
Consultation
8 Dec 2020
— completed
Target date
29 Dec 2020
— completed
Decided
16 Dec 2020
— completed

Application details

Reference
20/AP/3199
Local authority
Southwark
Ward
OLKE
Application type
All Other
Property type
Commercial

Key dates

Submitted
3 Nov 2020
Validated
3 Nov 2020
Comments close
8 Dec 2020
Target decision
29 Dec 2020
Decided
16 Dec 2020

Estimated project value

£100k–£250k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications