London Borough of Southwark
Alterations to the front elevation that includes the repairs and cleaning to the brickwork façade, existing parapet, cornice and guttering; new double glazed sash windows to the upper floors and casement windows to the roof mansard dormer; re-instatement of new timber shopfronts, timber stall risers and timber entrance doors; new internal tube and link roller grille behind the entrance doors; repairs to the projecting shopfront parapet with new timber fascia, signage and Victorian awning; repairs and decoration to the pilaster heads, granite pilaster faces and consoles
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 19/AP/0035
- Local authority
- Southwark
- Ward
- RYLA
- Application type
- All Other
- Property type
- Commercial
Key dates
- Submitted
- 10 Jan 2019
- Validated
- 10 Jan 2019
- Comments close
- 16 Feb 2019
- Target decision
- 7 Mar 2019
- Decided
- 22 Mar 2019
Estimated project value
£28k–£75k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade 2026 loft conversion cost guide.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of SouthwarkPermittedNext door
- 86 Peckham High Street Southwark SE15 5EDPermittedNext door
- London Borough of Southwark SE15 5EDPermittedNext door
- London Borough of Southwark SE15 5EDPermittedNext door
- London Borough of SouthwarkPermittedNext door
- London Borough of SouthwarkRefusedNext door