Land To East New Road Drax North Yorkshire
Discharge of conditions 39 (permanent water course crossing infrastructure), 40 (construction scheme) and 41 (installation details) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- ZG2026/0037/DOC
- Local authority
- North Yorkshire
- Ward
- Camblesforth And Carlton
- Application type
- Conditions
Key dates
- Submitted
- 15 Jan 2026
- Validated
- 15 Jan 2026
- Target decision
- 20 Mar 2026
14 documents · 5 comments · 100 constraints