Withdrawn22/T0520/TCASubmitted 4 years agoTree works

Vine Road Richmond upon Thames

Works have been raised for Cadent Gas Pipeline Clearance. These works are essential for the ongoing maintenance and safety of the gas pipeline. As part of Cadent Gas health and safety responsibility they require to maintain and inspect the pipeline regularly to ensure they are managed in accordance within the correct Pipeline Regulations. Supply operative team in order fell a mixture of mature trees and scrub land 6m wide through approximately 1.14 miles of mixed trees and vegetation. All waste will be laid as habitat piles and all trees felled to 50mm from ground level and treated with eco plugs to prevent regrowth

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
11 Jul 2022
— completed
Validated
11 Jul 2022
— completed
Consultation
— completed
Target date
22 Aug 2022
— completed
Decided
16 Aug 2022
— completed

Application details

Reference
22/T0520/TCA
Local authority
Richmond
Ward
MRB
Application type
All Other

Key dates

Submitted
11 Jul 2022
Validated
11 Jul 2022
Target decision
22 Aug 2022
Decided
16 Aug 2022

Estimated project value

£400–£3k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.