Vine Road Richmond upon Thames
Works have been raised for Cadent Gas Pipeline Clearance. These works are essential for the ongoing maintenance and safety of the gas pipeline. As part of Cadent Gas health and safety responsibility they require to maintain and inspect the pipeline regularly to ensure they are managed in accordance within the correct Pipeline Regulations. Supply operative team in order fell a mixture of mature trees and scrub land 6m wide through approximately 1.14 miles of mixed trees and vegetation. All waste will be laid as habitat piles and all trees felled to 50mm from ground level and treated with eco plugs to prevent regrowth
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 22/T0520/TCA
- Local authority
- Richmond
- Ward
- MRB
- Application type
- All Other
Key dates
- Submitted
- 11 Jul 2022
- Validated
- 11 Jul 2022
- Target decision
- 22 Aug 2022
- Decided
- 16 Aug 2022
Estimated project value
£400–£3k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Vine Road Richmond upon ThamesRefused93 yd
- Richmond upon ThamesPermitted93 yd
- Vine Road Richmond Upon Thames SW13 0NEPending102 yd
- 19 Vine Road Richmond SW13 0NEPermitted102 yd
- Vine Road Richmond Upon Thames SW13 0NEPending118 yd
- 8 The Elms Richmond upon Thames SW13 0NFPending168 yd