Land bounded by edge of the NWL Bran Sands Treatment Plant and former ICI Landfill to the south west; the extent of existing operations at the Redcar Bulk Terminal to the north west; a line of vegetation, Tod Point Road and line of buildings and existing infrastructure to the north east; and existing internal roads to the south east
Discharge of conditions 33 (A66 Mitigation). 34 (Cargo Fleet Mitigation), 35 (Cargo Fleet Study) and 36 (A66 and Newport Signals) following outline planning permission R/2020/0821/ESM for development of up to 464,515qm (gross) of general industry (Use Class B2) and storage or distribution facilities (Use Class B8) with office accommodation (Use Class E), hgv and car parking and associated infrastructure works (all matters reserved)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- R/2026/0775/CD
- Local authority
- Redcar and Cleveland
- Property type
- Commercial
Key dates
- Submitted
- 13 Oct 2026
Estimated project value
£15k–£120k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.