← Back to search

Withdrawn4425/21/01Submitted over a year agoBasement

Arlington Gardens Redbridge

Discharge of conditions for approved permission 4425/21: Submission of material samples (Condition 3); Control of construction activity and traffic - details (Condition 4); Cycle Parking (Condition 5); Basement (Condition 10);Sustainable drainage measures/surface water run-off attenuation measures (Condition 11); Fire Safety (Condition 12) (Summary)

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
11 Mar 2025
— completed
Validated
11 Mar 2025
— completed
Consultation
31 Mar 2025
— completed
Target date
5 May 2025
— completed
Decided
2 May 2025
— completed

Application details

Reference
4425/21/01
Local authority
Redbridge
Application type
All Other

Key dates

Submitted
11 Mar 2025
Validated
11 Mar 2025
Comments close
31 Mar 2025
Target decision
5 May 2025
Decided
2 May 2025

Estimated project value

£100k–£250k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications