NEW WANSTEAD Redbridge
Non-Material Amendment to approved permission 0052/26: Amend trigger point of conditions 7, 9 and 18 to allow site clearance works to be carried out. Proposed opening wording: Condition 7: Prior to the commencement of development (excluding site clearance and preparation works) details of how all windows on the eastern elevation etc. Condition 9: Prior to the commencement of development (excluding site clearance and preparation works) details of cooling for rooms and bedrooms etc. Condition 18: Prior to the commencement of development (excluding site clearance and preparation works) details of the SUDS drainage strategy etc. (summary)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 0052/26/01
- Local authority
- Redbridge
- Application type
- All Other
Key dates
- Submitted
- 30 Sept 2026
- Validated
- 30 Sept 2026
- Target decision
- 27 Oct 2026
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- NEW WANSTEAD RedbridgePermittedNext door
- NEW WANSTEAD RedbridgePendingNext door
- NEW WANSTEAD RedbridgePermittedNext door
- 5 7 New Wanstead Redbridge E11 2SHPermittedNext door
- New Wanstead Redbridge E11 2SHPendingNext door
- 5 7 New Wanstead Redbridge E11 2SHPermittedAdjoining