← Back to search

Pending26/03195/LBCSubmitted last week

Street Record Carham Berwick Borough Footpath 011 Carham Northumberland

Listed Building Consent for temporary access to the river/channel will be provided, including vegetation clearance where required. The working area around Bridge Pier 3 will be dewatered using temporary works, including a temporary watercourse diversion via upstream and downstream bagwork cofferdams and a PVC pipe (or suitable alternative) to maintain flows. Riverbed and bank materials will be excavated to formation level, followed by installation of a geotextile layer and rip-rap protection around Pier 3. The rip-rap will be backfilled and tied into upstream and downstream bed levels using reinstated site-won material, with bed levels reprofiled to provide a smooth transition over 2m. Excavated riverbanks will be reinstated using site-won material at slopes up to 1:2, covered with topsoil and biodegradable geotextile, and grass seeded to promote vegetation establishment.

View on council portalDocumentsComment

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
10 Sept 2026
— completed
Validated
15 Sept 2026
— completed
Consultation
— not yet reached
Target date
13 Oct 2026 (target)
— not yet reached
Decided
— not yet reached

Application details

Reference
26/03195/LBC
Local authority
Northumberland (County)

Key dates

Submitted
10 Sept 2026
Validated
15 Sept 2026
Target decision
13 Oct 2026

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.