← Back to search

Pending26/1206/PNMATSubmitted 3 weeks agoDriveway

Land North Of Mere Hall Farm Bloxholm Lane Branston And Mere

Application for a non-material amendments (reduction in the height of the pumping station from 11.3 metres to 7.49 metres, removal of a surge vessel and remaining three reduced in size, removal of surge vessel kiosk, reconfiguration and relocation of attenuation pond (increased in size) and associated realignment of fence line) following grant of planning permission 23/1043/FUL - Erection of pumping station and ancillary equipment, including formation of new site access, in connection with the Lincoln to Ancaster pipeline scheme (revised scheme to 21/0690/FUL)

View on council portalDocumentsComment

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
2 Oct 2026
— completed
Validated
2 Oct 2026
— completed
Consultation
—
— not yet reached
Target date
30 Oct 2026 (target)
— not yet reached
Decided
—
— not yet reached

Application details

Reference
26/1206/PNMAT
Local authority
North Kesteven
Property type
Agricultural

Key dates

Submitted
2 Oct 2026
Validated
2 Oct 2026
Target decision
30 Oct 2026

Estimated project value

£3k–£10k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyJobQuote 2026, £40-£120/m² installed.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.