Queen Elizabeth Olympic Park London Borough of Newham
Non-material amendment to planning consent ref: 18/00470/OUT (LLDC) dated 25th July 2019, comprising replacement of the approved glazing panels on the front elevation of Unit 3, Aquatics Walk, E20 2AS, with louvres and vertical fins on a like-for-like basis.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/01683/NONMAT
- Local authority
- Newham
- Ward
- STROLP
- Application type
- All Other
- Property type
- Commercial
Key dates
- Submitted
- 4 Aug 2026
- Validated
- 4 Aug 2026
- Target decision
- 31 Aug 2026
- Decided
- 21 Aug 2026
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Recorded changes
- 5 Sept 2026: Approved
Nearby applications
- London Borough of NewhamUnknownNext door
- London Borough of NewhamPermittedNext door
- Queen Elizabeth Olympic Park London Borough of NewhamPermittedNext door
- London Borough of NewhamPermittedNext door
- London Borough of NewhamUnknownNext door
- London Borough of NewhamPermittedNext door