Eastern Way Quarries, Land to the North and South of Eastern Way, Heath and Reach
Consultation from Central Bedfordshire Council on application ref. CB/26/02378/DB seeking permission for Development Brief relating to Hybrid Planning Application (Environmental Impact Assessment application) comprising: Part A – Full planning permission for 2 wind turbines with associated accesses, repowering through the life extension of the existing 'Double Arches' and 'Checkley Wood' wind turbines, solar arrays; and associated infrastructure; provision of a roundabout and junction amendments between the A5 (Watling Street) and Eastern Way; new access and road from Shenley Hill Road; new roundabout, revised junctions, accesses and improvements along Mile Tree Road; new roundabout and access to the north of Eastern Way. Part B - Outline planning permission for a mixed-use scheme including up to 3,600 residential units (including affordable housing and specialist accommodation for older people); new employment and industrial floorspace and ancillary facilities; community infrastructure (including Narrow Gauge Railway terminus and museum); education facilities (including a secondary school and primary schools); healthcare provision; local centre uses (to include retail, community and employment uses); sports hubs (including sports provision); green infrastructure and landscaping works (to include a country park, formal and informal open space, amenity space, woodland and ecological areas); electrical vehicle charging facilities; transport mobility hubs; drainage works (including foul and surface water drainage infrastructure); vehicular and active travel infrastructure; ground remodelling, engineering and demolition works. All matters reserved save for principal points of access. The development is submitted as a phased and severable scheme, and each component of the development is capable of being delivered independently
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- PLN/2026/1622
- Local authority
- Milton Keynes
- Application type
- Outline
- Property type
- Commercial
Key dates
- Submitted
- 31 Jul 2026
- Validated
- 31 Jul 2026
- Decided
- 20 Aug 2026
4 documents · 0 comments · 0 constraints
Estimated project value
£40k–£80k
Typical UK cost for this job type, scaled for a large scheme, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.