← Back to search

Unknown26/FULL/1979Submitted last weekSwimming pool

WIMBLEDON COLLEGE, 84 Edge Hill, Wimbledon, Merton, SW19 4NS

REFURBISHMENT OF THE EXISTING CHANGING ROOMS, ALTERATIONS TO THE EXISTING REDUNDANT CHANGING ROOMS TO CREATE NEW PLANT ROOMS AND AN ACCESSIBLE STAFF CHANGING ROOM. REFURBISHMENT TO THE SWIMMING POOL TANK AND RAISING OF THE EXISTING ROOF TO ACCOMMODATE A LEVEL ACCESS BETWEEN THE NEW ACCESSIBLE STAFF CHANGING ROOM AND THE SWIMMING POOL AREA. MINOR EXTERNAL WORKS TO PATHS.

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
7 Sept 2026
— completed
Validated
— not yet reached
Consultation
— not yet reached
Target date
— not yet reached
Decided
— not yet reached

Application details

Reference
26/FULL/1979
Local authority
Merton

Key dates

Submitted
7 Sept 2026

Estimated project value

£40k–£120k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.