Sheppey Leisure Complex Broadway Sheerness Kent ME12 1HH
Non-material amendment of application 24/502130/FULL: Polycarbonate and glazed windows to northern fa�ade internally. General M&E vents/Bib Taps on the North and South fa�ade. Roller Shutter to community room at first floor level. Additional render to the ground floor of the north elevation. External works/levels change including access ramps and brick walls to North and West fa�ade. Changes to the external plant zone boundary to the south of building. New bitmac surface to create step free accessible route near Beach Street. Hedges retained and extent of bitmac path resurfacing along Beach Street. Additional wet pour surfacing and fence adjustment to paddling pool area. Widened path from Beach Street car park. Lounger seats and planters relocated around outdoor gym.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/503745/NMAMD
- Local authority
- Maidstone
Key dates
- Submitted
- 30 Sept 2026
- Validated
- 30 Sept 2026
- Target decision
- 28 Oct 2026
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.