Everton Stadium, BRAMLEY MOORE DOCK Regent Road, Sandhills, Liverpool, L3 0BW
Planning application to vary condition 36 attached to planning ref 20F/0001 as amended by 22NM/0999 and 23NM/1137 (Application for Full Planning Permission in accordance with submitted drawings for the demolition of existing buildings/structures on site (listed in the schedule); remediation works; foundation/piling works; infill of the Bramley-Moore Dock, alteration to dock walls and dock isolation works with vehicular and pedestrian links above; and other associated engineering works to accommodate the development of a stadium (Use Class D2) predominantly for football use, with the ability to host other events, with ancillary offices (Use Class B1a); Club Shop and retail concessions (internal and external to the stadium) (Use Class A1); exhibition and conference facilities (Use Class D1); food and drink concessions (internal and external to the stadium) (Use Classes A3 / A4 / A5); betting shop concessions (Sui Generis); and associated infrastructure including: electric substation, creation of a water channel, outside broadcast compound, photo-voltaic panels, storage areas/compound, security booth, external concourse / fan zone including performance stage, vehicular and pedestrian access and circulation areas, hard and soft landscaping (including stepped plaza, canopies, lighting, wind mitigation structures, public art, tree planting and boundary treatments), cycle parking structures and vehicle parking (external at grade) and change of use of the Hydraulic Tower structure to an exhibition / cultural centre (Use Class D1) with ancillary food and drink concession (Use Class A3)) so as to allow no more than 8no. non-sporting events to take place at full capacity within the stadium in any calendar year, and of those no more than two may continue up until 23:30 with all music concerts finishing by 23:00.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26F/2362
- Local authority
- Liverpool
- Property type
- Commercial
Key dates
- Submitted
- 18 Aug 2026
Estimated project value
£15k–£100k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.